A stress-free office move: how to stay on top of things

A man in a blue shirt stands confidently with crossed arms in an office setting. Jesper Kieftenbeld on 3 November 2026
Reading time: 5 min
Design & Experience

A moving date is rarely negotiable. The lease is coming to an end, the new location is waiting, and everything needs to work from day one. Yet coordinating design, construction, technology and budgets often becomes difficult when too many separate parties are working towards the same deadline. In this article, you will discover how having one project lead responsible for workplace strategy, design and implementation can make the difference between stress and control, and where the real risks lie.

Plan Backwards from the First Operational Working Day

The fixed deadline is not the end of your project, but the starting point for planning. Translate the moving date into one integrated plan covering workplace strategy, design, permits, construction, building services, IT and audiovisual systems, testing, commissioning, relocation and aftercare. By working backwards from the first operational day, it becomes immediately clear which decisions need to be made and when.

Start by establishing the non-negotiable requirements. Confirm the moving date, the end of the current lease, the availability of the new location, the maximum budget, the minimum essential requirements and any temporary accommodation needs. Clearly define what must be fully operational on day one and what can be completed in phases after occupancy. This prevents every activity from becoming equally critical.

One Project Lead, One Integrated Overview

The greatest risk when working towards a relocation deadline rarely lies within a single discipline, but rather in the coordination between them. By placing design and implementation under one project lead, you establish one accountable project schedule, one budget report and one escalation process. This significantly reduces coordination risks, although it does not eliminate them entirely.

Use one master schedule, one cost estimate, one risk register, one decision log and one change register for designers, contractors, installation specialists, suppliers and internal teams. Design decisions then become immediately visible in terms of costs, technical implications, lead times and the critical path. Every identified risk is assigned an owner and a mitigation measure, making fact-based project management the standard rather than improvisation.

Freeze the Scope Before Construction Begins

Cost certainty in Design & Build projects sounds reassuring, but it is only meaningful when your requirements are complete. Before construction begins, finalise the Programme of Requirements, functional layout and technical specifications. These should describe the intended activities, peak occupancy, future growth, hybrid working arrangements, wellbeing, sustainability, appearance, technology and acceptance criteria.

Anything that is not explicitly included in the requirements specification and acceptance criteria may later result in disputes, additional costs or reduced quality.

Therefore, schedule formal approvals for the concept, final design, budget and technical specifications. Every subsequent change should be recorded and assessed for its impact on time, cost, quality and risk. Without effective change management, the intended certainty around budget and scheduling can quickly disappear.

Design for Peak Utilisation, Not Averages

Designing a workplace based solely on employee numbers is a common mistake. Average office occupancy in the Netherlands increased to 59% in 2025, but Tuesdays and Thursdays consistently remain the busiest days. An average occupancy rate of 59% can therefore coexist with capacity shortages on peak days and largely empty offices on Fridays.

Instead, analyse occupancy by day, zone and activity. With hybrid working firmly established and 5.1 million people in the Netherlands working from home either regularly or occasionally in 2025, actual utilisation data should form the foundation of every well-considered workplace layout. This allows you to create a flexible working environment that supports productivity and wellbeing without providing too much or too little office space.

Treat Technology as a Design Driver, Not an Afterthought

Building services, IT, audiovisual systems and security should never be treated as final details. They represent both a significant cost component and a potential source of delays. Across EMEA, mechanical and electrical installations, together with security, IT and audiovisual systems, account for more than 40% of total office fit-out costs on average.

These elements should therefore be included in the design and budget from the initial project meeting. Coordinate capacity, cable routing, cooling, acoustics, Wi-Fi, booking systems and access control at an early stage.

In addition, treat commissioning tests, user training and handover documentation as a dedicated project phase. Systems may be physically installed but not yet tested, commissioned or ready for handover. Allow sufficient time for testing, training and resolving defects. Otherwise, the risk shifts to the very week when there is no longer any room for delays.

Address Legal Requirements and Employee Consultation from the Start

Legal procedures can determine the critical path of your project. From the outset, check permit requirements, landlord conditions, fire safety regulations, energy performance requirements and employee consultation obligations. In the Netherlands, a fire safety notification must be submitted at least four weeks before a building is put into use, and office buildings must generally have an energy performance certificate of at least label C.

Involve the works council at an early stage. A proposed significant business relocation is subject to the works council’s right to provide advice, even when the move takes place within the same municipality. This advice must be requested at a stage when it can still influence the decision. Clearly establish in advance who provides advice and who makes decisions regarding design, budget and project scope.

The Reality of Turnkey Projects

Design & Build can accelerate project delivery by allowing design and construction activities to overlap, while providing a single point of contact. However, a turnkey approach does not automatically guarantee delivery on time or within budget. Responsibility is only transferred to the extent defined by the contract, project scope and liability arrangements. You remain responsible for making timely decisions and providing accurate information.

This is precisely where the strength of bringing workplace strategy, design and implementation together under one roof becomes clear. Data, technology, budgets and schedules are coordinated in a manageable and structured way.

The result is greater peace of mind, direction and control, along with a future-proof working environment that meets the deadline without compromising quality.